Week of 2/20/2019

Week of 2/20/2019 The team is ready to place an order for the main components of the design for McMaster-Car. Furthermore, the team has also visited the sims facility for acquiring metal. Akash and Josh will be sharing a 4'x4' steel sheet for their design. Currently, the team is working towards, finish up the drawings for the parts.

Week of 2/13/2019

Image
Guide Arm   After the move into the new location and changes in the plan for the track. There persisted the question of whether I needed to make changes to my design from last semester. On February 13, I spoke with both the guide way team and interaction team. The dependencies of my design are on the distance between the track and the mounting points on the slave and drive bogie. After consulting the team, it was confirmed the track gap will remain at 12 cm and the mounting points are going to be the same.             The goal of this semester is to manufacture and test our designs. To get start, my bill of materials is mostly done. I have selected the wheels for my design; however, McMaster-Car did not have the exact wheels the designed needed, so I had to change my design. I changed some dimensions, and decrease the number of wheels needed for the design. Furthermore, I have found the steel tubing on McMaster-Car for my design, aga...