Week 15
Week 15 The focus of the whole week was preparation for the presentation. Going forward the team has a few goals left to complete. The first finish up any Design modifications that are left. Secondly, the goal is to finish the final report before the end of the semester. Lastly, the team aim to have a finished Bill of Materials. Guide Arm: The guide arm design and assembly is complete. The mounted points have been added to both the drive and slave bogie guide arm. The last FEA was also completed for the slave bogie guide arm as show below. There are confirmed mounting points on the slave bogie. There still need to be mounting points made on the drive bogie. Factor of Safety = 3.321 Factor of Safety = 3.659 ...