Week of 3/27-4/5

The team has dropped of all of all of its material required by the central shop on Tues 4/2 and pick up all the sheet metal water jet parts on Wednesday (4/3). So I have all the parts that I needed water jet cut for the guide arm. Also, I worked with Dr. Furman with milling out the tabs on 3/29. The makerspace was closed on following monday. I was able to use the lathe to reduce the diameter for a steel rod which I needed. The team is preparing for presentation upcoming week. For the guide arm the next step is to start welding, which requires access to welding. I have completed the welding module for makerspace.